ATESS ESS System in Brazil was Completed

منشور على 22-2-2021
Atess Power Technology 
The installation work of ATESS ESS system for the 5th Special Border Platoon (5th PEF) located in Auaris was completed.



The system consists of 2units ATESS HPS50 and storage battery, with 198 kW PV power and 248,4 kWh battery capacity. It will provide the required electricity to the 5th PEF of the Roraima Border Command/ 7th Jungle Infantry Battalion subordinated to the 1st Jungle Infantry Brigade.



Ever since the system starts running, the 5th PEF no longer relies on air transport of diesel oil for the supply of its generators, making the generation of electricity much cheaper and more stable.



المصدر: ATESS
ملفات ENF للشركات المذكورة في هذه المقالة

Atess Power Technology (مكونات أنظمة الطاقة الشمسية): https://ar.enfsolar.com/atess-power-technology
يُعاد نشر أخبار الصناعة الشمسية مجانا, رجاءا أرسل أخبارك إلينا على